1. Tell Us What You Need

Start by sending us basic information about what you are buying or shipping from China.

Useful information includes:

If you do not yet know the exact weight or carton dimensions, supplier information or product links are usually enough for us to review the first step.

2. We Review Your Shipment Requirements

Our China team reviews the information you provide and determines what warehouse and shipping services may be needed.

Depending on the order, this may include:

Special products may require additional review before they are sent to the warehouse.

3. Confirm the Product Type

Different products require different handling and shipping arrangements.

We confirm whether the shipment contains:

This helps us determine whether any special packaging, documents or shipping channels are required.

4. Receive the China Warehouse Address

Once the shipment has been reviewed, we provide the warehouse receiving information needed for your suppliers.

You can then give the warehouse address and receiving reference to:

Your suppliers ship the goods domestically within China to our warehouse.

5. Send Us the Domestic Tracking Numbers

After each supplier ships the goods, send us the Chinese domestic tracking number.

This helps us match arriving packages with your order.

Useful information may include:

When buying from multiple suppliers, each tracking number should be provided separately.

6. Goods Arrive at Our China Warehouse

When the packages arrive, our warehouse receives and records them.

We can record:

Each shipment can be identified before further warehouse handling begins.

7. Check the Outer Packaging

Before opening the goods, we can check the visible condition of the supplier packaging.

We look for:

Photos can be taken if the shipment arrives with visible damage.

8. Confirm Which Packages Have Arrived

If you are buying from several suppliers, we can help keep track of which supplier shipments have reached the warehouse.

The status may include:

This allows you to decide whether to wait for additional goods or continue with the shipments already received.

9. Product Inspection if Required

If you request inspection, the warehouse can check the goods according to your instructions.

Depending on the product, this may include:

The inspection scope should be confirmed before the work begins.

10. Photo and Video Check

Photos or videos can be provided so you can see the actual goods before they leave China.

The visual record may include:

If there is something specific you want to see, you can send detailed photo or video instructions.

11. We Report Any Obvious Problems

If visible problems are found, we can document them before international shipping.

Examples include:

Photos or videos can be sent to help you review the issue.

12. You Decide How to Handle Problems

If there is a problem, the goods do not need to be shipped internationally immediately.

Depending on the situation, you can choose to:

This allows many supplier problems to be handled while the products are still in China.

13. Wait for Other Supplier Orders

If you have several suppliers, goods that arrive earlier can remain at the warehouse while we wait for the remaining shipments according to the agreed storage arrangement.

This is useful when buying:

Once the required shipments have arrived, consolidation can begin.

14. Consolidate Multiple Supplier Shipments

Instead of shipping every supplier package internationally on its own, compatible goods can be combined.

The warehouse may:

The objective is to create a more manageable final shipment.

15. Repack the Goods if Needed

Supplier packaging may not be suitable for international transport.

Depending on the products and your requirements, we can:

The packing method is selected according to the actual goods.

16. Prepare Custom or Ready-to-Distribute Packaging

If you need products prepared in a specific format, repacking can be completed before international shipping.

For example, products can be prepared as:

Products from several suppliers can be combined with:

The finished packages can arrive ready for distribution.

17. Confirm the Final Packing Result

After consolidation and repacking, we can provide information about the completed shipment.

This may include:

You can review the packing result before international dispatch where required.

18. Measure the Final Shipment

Once the final packaging is complete, each shipping unit can be measured.

We record:

Final measurements are important because international freight costs may depend on volumetric weight.

19. Weigh the Final Shipment

The completed shipment is weighed after packing.

We can record:

The final packed weight is more reliable for freight pricing than an early supplier estimate.

20. Review Shipping Options

Based on the final shipment information, we can review suitable international transport options.

Depending on the goods and destination, options may include:

The best option depends on cost, delivery time, product type and destination.

21. Confirm the Shipping Quotation

The final quotation can be prepared using the actual shipment information.

Pricing may depend on:

You review and confirm the shipping arrangement before dispatch.

22. Prepare Shipping Information

Before the goods leave China, the necessary shipping information is prepared.

Depending on the shipment, this may include:

Special cargo may require additional documents.

23. Final Pre-Shipment Check

Before handover to the international carrier, we can complete a final check of the shipment.

This may include:

Final shipment photos can also be taken.

24. Goods Leave Our China Warehouse

After the shipment is confirmed, the goods are handed over to the selected logistics provider.

Depending on the shipping method, they may move to:

International transportation then begins.

25. Export Transportation From China

The goods complete the required export handling before leaving China.

The exact process depends on:

Special goods may require different handling from ordinary general cargo.

26. International Transportation

The shipment travels from China toward the destination country.

Transportation may involve:

The route depends on the selected service.

27. Tracking Information

Where tracking is available, shipment information can be provided after dispatch.

Depending on the route, this may include:

Some multi-stage shipments may use different tracking numbers during different parts of the journey.

28. Arrival at the Destination Country

When the shipment reaches the destination country, it normally enters the import handling process.

The cargo may arrive at:

The next step depends on the selected shipping service.

29. Customs Clearance

The shipment may need to complete customs clearance before local delivery.

Customs may review:

Additional information may be requested by customs authorities.

30. DDP Customs Handling Where Applicable

If you selected a confirmed DDP service, customs clearance arrangements and applicable duty or tax handling follow the scope agreed in the quotation.

The exact DDP arrangement can vary depending on:

The included services should therefore be confirmed before shipment.

31. Customs Release

Once the required import procedures are completed, the goods are released into the local delivery network.

The shipment may then move to:

32. Last-Mile Delivery

For door-to-door services, the local carrier delivers the goods to the confirmed destination address.

Depending on shipment size, this may involve:

Large or heavy cargo may require the receiver to arrange suitable unloading conditions.

33. Receive Your Goods

When the shipment arrives, check the external condition of the packages as soon as practical.

If visible transportation damage is found, it is useful to:

These records may be needed if a transportation claim is reviewed.

34. One Process From Chinese Supplier to Your Door

The complete service can connect the major steps between purchasing from China and receiving the goods overseas:

The purpose is to give overseas buyers a clearer and more manageable way to handle products in China before international delivery.